Geely University of China, ChengDu, SiChuan, 641423, China, China
BibTex Citation Data :
@article{IJRED62374, author = {Tong Liu and Jiong Li and Ke Yi}, title = {Techno-Economic Optimization and Long-Term Forecasting of Offshore Wind Farms: A Model Predictive Control Approach for the Shanghai Coastal Development Zone}, journal = {International Journal of Renewable Energy Development}, volume = {0}, number = {0}, year = {2027}, keywords = {Model predictive control; Offshore wind farm optimization; Techno-economic assessment; Wake interaction and turbine spacing; Annual energy production uncertainty (P50 / P90); WindSim-based layout analysis}, abstract = {This research investigates the potential deployment of offshore wind energy within Shanghai, China’s shoreline. An offshore wind farm located in a designated development zone is subjected to a techno-economic optimization framework. The Annual Energy Production (AEP) of this farm is forecast over 10- and 25-year horizons at 50%, 75%, and 90% probability levels by applying a Model Predictive Control (MPC)-based supervisory strategy at the wind farm level. In this framework, MPC anticipates future wind conditions and farm-level operating states over a prediction horizon and determines the optimal operational and layout decisions under technical limits and wake-induced interaction between turbines. Reducing the turbine spacing from 12D to 6D increases the installed turbine count from 53 to 132, while only slightly decreasing the capacity factor from 48.6% to 47.6%. Results indicate that reducing inter-turbine spacing significantly increases the number of installable turbines up to approximately 118 units in the defined area, while only slightly decreasing the capacity factor due to stronger wake interactions. MPC-based supervisory strategy enables consistent estimation of long-term energy yield and associated financial performance of the offshore site by linking predicted AEP under different confidence levels (P50 = 1920 GWh/y, P75 = 2050 GWh/y, P90 = 2210 GWh/y) with project-scale economic metrics. P90 estimates, representing downside production risk, are directly applicable to financial assessments and project bankability evaluations. This integrated predictive control and optimization approach is demonstrated to be effective for offshore wind planning in large coastal regions, such as those near Shanghai, providing a basis for informed investment decisions under operational and economic uncertainty.}, doi = {10.61435/ijred.2026.62374}, url = {https://ijred.cbiore.id/index.php/ijred/article/view/62374} }
Refworks Citation Data :
Article Metrics:
Last update:
Last update: 2026-11-24 07:18:58
This journal provides immediate open access to its content on the principle that making research freely available to the public supports a greater global exchange of knowledge. Articles are freely available to both subscribers and the wider public with permitted reuse.
All articles published Open Access will be immediately and permanently free for everyone to read and download. We are continuously working with our author communities to select the best choice of license options: Creative Commons Attribution-ShareAlike (CC BY-SA). Authors and readers can copy and redistribute the material in any medium or format, as well as remix, transform, and build upon the material for any purpose, even commercially, but they must give appropriate credit (cite to the article or content), provide a link to the license, and indicate if changes were made. If you remix, transform, or build upon the material, you must distribute your contributions under the same license as the original.
International Journal of Renewable Energy Development (ISSN:2252-4940) published by CBIORE is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.